A knowledge horizon marks the last date for which a rule has complete data. Use it when a schedule depends on a holiday list or another dataset that only covers a limited period.

import {
isActiveAt,
all,
dates,
knownThrough,
not,
unknownIntervals,
weekdays,
} from "@kensio/quando";
const at = (iso: string): Temporal.ZonedDateTime =>
Temporal.ZonedDateTime.from(`${iso}[Europe/London]`);
const holidays = knownThrough("2026-12-31", dates("2026-12-25"));
const open = all(weekdays(), not(holidays));

knownThrough applies a horizon to the rule it wraps. The named date is included, as it is in onOrBefore. In this example, the holiday list is complete through 31 December 2026. Queries within that period evaluate normally.

isActiveAt(open, at("2026-03-09T10:00")); // true

A query throws BeyondHorizonError if its answer depends on the holiday list past that date:

isActiveAt(open, at("2029-04-03T10:00"));
// BeyondHorizonError: isActiveAt() cannot answer for 2029-04-03T10:00:00: the
// rules stop being known before then. Use unknownIntervals() to read where the answer
// runs out, or widen the horizon the rules declare.

The schedule requires a weekday. A Saturday is therefore closed even when its holiday status is unknown:

isActiveAt(open, at("2029-04-07T10:00")); // false

Quando throws only when missing data could change the answer. During evaluation, it tracks the time a rule certainly covers and the time it might cover. The difference is unknown coverage. all intersects these bounds, and any unions them. For not, certain coverage is everything outside the inner rule’s possible coverage. Possible coverage is everything outside its certain coverage.

unknownIntervals returns the periods where the available data cannot determine whether the rule applies:

const week = { from: at("2029-04-02T00:00"), to: at("2029-04-09T00:00") };
[...unknownIntervals(open, week)];
// [{ start: 2029-04-02T00:00, end: 2029-04-07T00:00 }]

The query window runs from Monday to Monday. Only the five weekdays have unknown coverage because the weekend is known to be closed. A rule with no horizons has no unknown intervals.

A custom rule can declare the horizon of the dataset it reads. The stored schedule then refers to the rule by name, while the registry supplies both the data and its horizon:

const holidayTable: CustomRuleType = {
intervals: (context) => loadedHolidays(context),
knownThrough: () => "2026-12-31",
};
const schedule = all(weekdays(), not(customRule("holidays")));
isActiveAt(schedule, at("2029-04-03T10:00"), {
rules: { holidays: holidayTable },
});
// BeyondHorizonError

The knownThrough callback is optional. Without it, Quando treats the custom rule’s answers as known for all dates.

onOrBefore("2026-12-31") excludes all time after that date. Use it when a schedule ends on a known date.

knownThrough("2026-12-31", rule) leaves later coverage unknown. Use it when the rule’s data ends on that date but the schedule may continue.

const account = explainRule(open, at("2029-04-03T10:00"));
account.status; // "unknown"
account.description;
// "Whether this matches is not known. The rules stop being known before this
// time."

status distinguishes missing knowledge from a known match or rejection. Read it before presenting an answer.

A horizon is part of the rule’s JSON data. It is preserved during storage, parsing, and canonicalisation:

{
"type": "known",
"through": "2026-12-31",
"rule": { "type": "dates", "dates": ["2026-12-25"] }
}

toCron and toRRule return ok: false for a rule with a knowledge horizon. Neither format can preserve unknown coverage.

A cascade has an unknown result when missing data could change its assigned value. unknownValueIntervals returns those periods. resolve omits them from its output.

const schedule = {
type: "cascade",
layers: [
{ scope: weekdays(), value: "open" },
{ label: "holidays", scope: holidays, value: "closed" },
],
};
[...unknownValueIntervals(schedule, week)];
// the whole week: past its horizon the holiday layer might claim any of it
valueAt(schedule, at("2029-04-03T10:00"));
// BeyondHorizonError: valueAt() cannot answer for 2029-04-03T10:00:00 …

The whole week has unknown values, including the weekend. The holiday layer has the highest priority. Beyond its horizon, it might assign "closed" on any date, including a Saturday that would otherwise have no assigned value.

Higher-priority layers can determine the answer

Section titled “Higher-priority layers can determine the answer”

Reverse the layer order to give the known weekday layer higher priority:

const schedule = {
type: "cascade",
layers: [
{ label: "holidays", scope: holidays, value: "closed" },
{ scope: weekdays(), value: "open" },
],
};
[...resolve(schedule, week)];
// [{ start: Mon, end: Sat, value: "open" }]
[...unknownValueIntervals(schedule, week)];
// [{ start: Sat, end: Mon }]
valueAt(schedule, at("2029-04-03T10:00")); // "open"

Weekday values are now known because the later weekday layer overrides any value from the holiday layer. Weekend values remain unknown because only the holiday layer could assign them.

The sum, max, min, and concat strategies use contributions from every matching layer. An unknown contribution makes the merged result unknown:

const headcount = {
type: "cascade",
merge: "sum",
layers: [
{ scope: always(), value: 1 },
{ scope: knownThrough("2026-12-31", always()), value: 1 },
],
};
[...resolve(headcount, week)]; // nothing settled past the horizon